Amenam

Akogep-Phase-2-sofregaz
Akogep-Phase-2-sofregaz

Project details

  • Project Name:  Akogep, Amenam phase 2- Onshore gas pipeline
  • Country:  Nigeria
  • Project Location Within Country:  Bonny island
  • Name of Client:  STOLT OFFSHORE (now SUBSEA 7)
  • Start Date: March 2004
  • Completion Date: December 2004

Project description 

COMPANY has developed the detail engineering of the Onshore section of the 24” gas pipeline from offshore AMP2 to Bonny LNG plant. The pipeline length is 8 km with an Maximum operating pressure of 147.5 barg

 

SOFREGAZ scope of work

SOFREGAZ has developed the following:

  • Specifications & site supervision of topographic & geotechnical surveys
  • Pipeline route map and alignment sheets
  • Design and drawings for roads, cable, pipelines and river crossings
  • Pipeline design and mechanical calculations
  • Cathodic protection design
  • Material Take Off