Project details
- Project Name: FEED of Guangxi LNG Terminal
- Country: China
- Project Location Within Country: Tieshangang industry area of Behai City, Guangxi
- Name of Client : SINOPEC
- Start Date: September 2012
- Completion Date: April 2013
- Name of associated firm: TECHNODYNE
Detailed Narrative Description of Project & Services Provided
The Guangxi LNG project includes a 500 m Jetty and its associated Berth platform on which are installed 5 unloading 16’’ arms LNG, 4 LNG tank of 160,000 m3, re-gasification unit (with 4 ORV), a send-out unit (composed of 4 HP pumps), a fiscal metering system and a LNG truck loading facilities (10 bays).
The project of GUANGXI Liquefied Natural Gas (LNG) project will be constructed in three phases according to GUANGXI area market and gas supply plan, the capacity of the terminal in phase 1 is 3.5 MTPA
In Phase 2, the capacity of the terminal will be expanded to 7 MTPA. The construction of Phase 2 elements is predicted to start just after completion of Phase 1.
An ultimate Phase is also predicted. The capacity of the Terminal will be 11 MTPA.
Scope of work
The Front End Engineering Design (FEED) performed gives technical basis to allow Chinese technical institute to develop the detail engineering and to start the construction.
SOFREGAZ has performed with its own resources all process and utility design of this project and has subcontracted to Technodyne the design of the LNG tanks.
To guarantee the quality of the services provided, several design and HSE reviews have been performed during the FEED:
- Plot plan review
- P&IDs review
- HAZID review
- FHA and QRA
- HAZOP review
- SIL classification
- Final FEED review
After FEED completion, SOFREGAZ is involved in the supervision of detail engineering performed by the Chinese institute of SINOPEC (LPEC), to guaranty the performance value established during the FEED for the LNG terminal.
All Projects: